Turbomachine passage cleaning system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9376931
APP PUB NO 20130195694A1
SERIAL NO

13359962

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbomachine passage cleaning system includes a first airflow passage having a first inlet configured and disposed to fluidly connect to a compressor portion, a first outlet configured and disposed to fluidly connect to a turbine portion, and a first intermediate portion including a first strainer. A second airflow passage is fluidly coupled to the first airflow passage. The second airflow passage has a second intermediate portion having second strainer. A first valve is arranged in the first intermediate portion upstream from the first strainer, and a second valve is arranged in the second intermediate portion upstream from the second strainer. The first and second valves are selectively operated to control fluid flow into respective ones of the first and second airflow passages to filter air passing from a turbomachine compressor portion to a turbomachine turbine portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byrd, Douglas Scott Greer, US 22 214
Itzel, Gary Michael Simpsonville, US 96 1157
Iyer, Arun Meenakshinatha Greenville, US 3 6
Maldonado, Jaime Javier Simpsonville, US 10 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00