Turbulent mesophase pitch process and products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9376626
SERIAL NO

13458434

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing mesophase pitch using a long tube reactor is disclosed. An aromatic rich feed, preferably a petroleum pitch having a softening point above 100° C., is preheated to a temperature above its softening point and mixed with a vapor, preferably steam, in a long tubular reactor under intense mixing conditions, preferably fully developed turbulent flow such as mist annular flow, with a residence time at least an order of magnitude less than prior art processes and preferably less than 10 seconds. Preferably the reactor is heated by electric resistance or induction heating or by immersion in a heated fluid or in a fired heater. Mesophase pitch with a high coking value and a surprisingly low quinolone insoluble content is produced. The byproducts of thermal polymerization and thermal dealkylation have less than 50% as much olefin and diene content as compared to similar byproducts from prior art processes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACP TECHNOLOGIES LLC20527 STEPHENS STREET ST CLAIR SHORES MI 48080

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Donald M Huntington, US 14 144
Malone, Donald P Grayson, US 28 165

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00