Heavy lifting apparatus and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9376291
APP PUB NO 20150048043A1
SERIAL NO

14374964

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1. The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will be required for the main lifting operation. The crane comprises a pair of jib-frames 20 with boom arms 26, 27 which can be retracted during lifting and then deployed to a pivotable, loadbearing position once the crane is mounted at the top of the tower 1. Hydraulic strand jacks 31 and heavy-duty strands 45 are preferably used for the heavy lifting. In a preparation step, a load-bearing bracket assembly 13, 14, to which the jib-frames 20 will be secured, is hoisted up and fitted to the top of the tower 1. Once the lifting operations are complete, the crane assembly and the bracket assembly 13, 14 are lowered from the tower 1 and removed from site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VSL INTERNATIONAL AG3014 BERN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Althaus, Walter Singapore, SG 2 25
Laurens, Jean Marie Lausanne, CH 3 25
Meyer, Max Ernst Singapore, SG 2 21
Russell, Guy Singapore, SG 3 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 28, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00