Controller, data storage device, and data communication system having variable communication speed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9372625
APP PUB NO 20140122747A1
SERIAL NO

13850844

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses having variable communication speeds are disclose. In one example, an apparatus may comprise a controller configured to: receive a signal from a host, the signal being compatible with a data communication protocol at a first data communication speed; selectively implement a first data communication protocol from a plurality of data communication protocols to communicate with a first memory or implement a second data communication protocol from the plurality of data communication protocols to communicate with a second memory based on the data communication speed; store data in the first memory via the first data communication protocol when the data communication speed is a first speed; and store data in the second memory via the second data communication protocol when the data communication speed is a second speed that is different than the first speed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEAGATE TECHNOLOGY INTERNATIONALC/O MAPLES AND CALDER P O BOX 309 UGLAND HOUSE GRAND CAYMAN KY1-1104

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heo, Keun Seoul, KR 13 60
Kim, Byung Wook Suwon-si, KR 51 113
Ku, Young Min Suwon-si, KR 5 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00