Method for extracting bitumen from an oil sand stream

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9371490
APP PUB NO 20130334105A1
SERIAL NO

13890956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method for extracting bitumen from an oil sand stream, the method including the steps of: (a) providing an oil sand stream; (b) contacting the oil sand stream with a liquid comprising a solvent thereby obtaining a solvent-diluted oil sand slurry; (c) separating the solvent-diluted oil sand slurry, thereby obtaining a first solids-depleted stream and a first solids-enriched stream; (d) filtering the first solids-enriched stream obtained in step (c), thereby obtaining bitumen-depleted sand and at least a first filtrate; (e) increasing the S/B weight ratio of at least a part of the first filtrate by combining it with a stream having a higher S/B weight ratio thereby obtaining a combined stream; and (f) separating the combined stream, thereby obtaining a second solids-depleted stream and a second solids-enriched stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANADIAN NATURAL UPGRADING LIMITED100 855 2 STREET SW CALGARY ALBERTA T2P 4J8 CANADA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colenbrander, Gerhardus Willem Amsterdam, NL 6 15
Ploemen, Ingmar Hubertus Josephina Amsterdam, NL 22 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00