Thermal regulating building materials and other construction components containing phase change materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9371400
SERIAL NO

13525676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A material for energy management and peak energy reduction in a building structure, comprises an insulative base material, a first phase change material, and a functional polymeric phase change material that dynamically absorbs and releases heat to adjust heat transfer. The functional polymeric phase change material has at least one phase change temperature in the range between −10° C. and 100° C. and a phase change enthalpy of at least 5 Joules per gram, the functional polymeric phase change material including a plurality of polymer chains that include a backbone chain and a plurality of side chains, wherein a first portion of the plurality of polymer chains are crosslinked to each other, wherein a second portion of the plurality of polymer chains are crosslinked with the first phase change material and a third portion of the plurality of side chains are mechanically entangled with the inorganic insulative base material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LATENT HEAT SOLUTIONS LLC831 PINE RIDGE ROAD GOLDEN CO 80403

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eyal, Aharon Jerusalem, IL 102 1312
Hartmann, Mark Boulder, US 56 938
Roda, Greg Broomfield, US 9 218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 21, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00