Sub-harmonic arc fault detection system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9366716
SERIAL NO

13901393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention provide systems and methods for detecting a sustained arc in an electrical system. Over a time period, current and voltage data for a load signal are collected, from which spectral information is extracted. The spectral information has a frequency component and an amplitude component. The load signal is processed to remove a line frequency signature from the spectral information. One or more sub-harmonic frequency bands are extracted from the load signal and analyzed to determine the presence of an arc signature therein. The sub-harmonic frequency bands may be centered on frequencies corresponding to an integer number of half line cycle periods. Analysis of the sub-harmonic frequency bands can include detecting the peak amplitudes of the rectified sub-harmonic frequency bands to obtain an indicator signal and determining if the indicator signal exceeds a threshold that indicates the presence of the sustained arc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NVENT SERVICES GMBHMÜHLENSTRASSE 26 SCHAFFHAUSEN 8200

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zach, Juergen J Menlo Park, US 7 54

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00