In-line frame connector assembly and system for large portable frameworks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9366022
APP PUB NO 20150047283A1
SERIAL NO

14459233

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A frame connector assembly is adapted to releasably secure first and second frame members in line with one another. The connector assembly includes first and second expansion elements elastically interconnected. The second expansion element includes two hollow lobes joined by a web. When the connector assembly is received by the two frame members, threaded rotation of one or more threaded actuators forces the expansion elements apart and into engagement with opposing primary walls of the frame members. The threaded actuator also presses against the web, thereby causing resilient outward rotation of the lobes. This rotation results in compressive engagement between the outboard edges of the second expansion element and respective intermediate walls of the frame members. Thus, the connector assembly imposes locking forces to the frame members along two axes orthogonal to the main axis of the frame connector assembly. The expansion elements may have an identical extrusion cross-section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TWIN BROOK CAPITAL PARTNERS LLC AS AGENT300 SOUTH WACKER DRIVE SUITE 3500 CHICAGO IL 60606

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frey, Robert M Salt Lake City, US 16 178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00