Method for preparing quaternary phosphonium salts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9365596
APP PUB NO 20150166587A1
SERIAL NO

14565250

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A two-step pathway for preparing high pure quaternary phosphonium salts is disclosed. In the first step, hydrogen phosphide (PH3) or a higher phosphine reacts with a protonic compound to produce a phosphonium salt, which then reacts with a carbonic acid diester to produce a quaternary phosphonium salt in the second step. On one hand, hydrogen phosphide (PH3) and higher phosphines, including primary phosphines, secondary phosphines, and tertiary phosphines, after neutralization with protonic compound, become sufficiently reactive and can be alkylated by carbonic acid diester to form quaternary phosphonium cations. On the other hand, as an anion-exchange procedure is completely avoided, the process not only gives quaternary phosphonium salts of high purity, but also gives people freedom to design the cation and the anion of a quaternary phosphonium salt synchronously by choosing a preferred phosphine and a protonic compound that can supply a desired anion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROVAST POWER SYSTEMS CO LTDHUZHOU ZHEJIANG 313000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nie, Yunhua Huzhou, CN 5 54
Qiu, Jian Huzhou, CN 85 913
Shen, Dawei Huzhou, CN 18 143
Zhang, Yumei Huzhou, CN 13 44
Zheng, Zhuoqun Huzhou, CN 9 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 14, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00