Ultra low power-data driven networking processing device for avoiding overload

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9363196
APP PUB NO 20140219084A1
SERIAL NO

14232951

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is provided with: a data-driven processor comprising at least a firing control which determines whether or not firing conditions have been met by determining whether or not all packets necessary for instruction execution have been received when a packet that convey a part of partitioned data to be processed has been input, and a data processing unit for performing processing corresponding to the packets transmitted from the firing control if the firing conditions have been met; a power supply circuit for supplying power to the data-driven processor; and overload avoidance means for refusing input of the packets to the data-driven processor, if a determination has been made that a data processing load in the data-driven processor may reach an overloaded state in which the data processing may stall, on the basis of current consumption in the data-driven processor. Accordingly, power consumption in a networking system is reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKAI UNIVERSITY (25%)28-4 TOMIGAYA 2-CHOME SHIBUYA-KU TOKYO 1518677
KOCHI UNIVERSITY OF TECHNOLOGY (25%)185 TOSAYAMADA-CHO MIYANOKUCHI KAMI-SHI KOCHI 7828502
UNIVERSITY OF TSUKUBA (50%)1-1 TENNODAI 1-CHOME TSUKUBA-SHI IBARAKI 3058577

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Hiroshi Tokyo, JP 343 5139
Iwata, Makoto Kami, JP 21 162
Nishikawa, Hiroaki Tsukuba, JP 30 724
Sannomiya, Shuji Tsukuba, JP 2 3
Utsu, Keisuke Tokyo, JP 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00