Resonant power conversion apparatus and controlling method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9362835
APP PUB NO 20150109830A1
SERIAL NO

14460381

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resonant power conversion apparatus and a controlling method of the resonant power conversion apparatus are provided. The resonant power conversion apparatus includes a switch-based resonant converter and a controller. The switch-based resonant converter is configured to supply power to a load. The controller is coupled to the switch-based resonant converter and the load and configured to control switching of the switch-based resonant converter to regulate power conversion of the switch-based resonant converter. The controller has a voltage control loop and a current control loop. The controller detects a driving state of the load and enables one of the voltage control loop and the current control loop according to the detection result to adjust a switching frequency of the switch-based resonant converter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FSP TECHNOLOGY INCNO 22 JIANGUO E RD TAOYUAN CITY TAOYUAN COUNTY 330
FSP-POWERLAND TECHNOLOGY INC4TH FLOOR BUILDING 7 R&D REGION I XUZHUANG SOFTWARE INDUSTRIAL BASE # 699-8 XUANWU AVENUE XUANWU DISTRIAL NANJING 210042

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Duan, Fei-Yue Nanjing, CN 3 27
Xu, Ming Nanjing, CN 491 9425

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 7, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00