Polymer bag grouting method for repairing settlement of underground pipelines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9353888
APP PUB NO 20160102782A1
SERIAL NO

14969474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymer bag grouting method for repairing a settlement of an underground pipeline includes steps of: (1) detecting a settled pipeline section and determining a grouting plan; (2) drilling holes for containing bags; (3) placing the bags into the holes; (4) injecting a polymer material into the bags; (5) uplifting the settled pipeline section; and, (6) filling a cavity and reinforcing a soft soil layer. The polymer material is a non-water reacted two-component polymer material. The method provided by the present invention has advantages of rapidness, small cut, light mass, high tenacity, economy and durability. The method is advanced, highly-efficient, economical and practical and able to rapidly repair the settlement of the pipeline section through uplifting. The method of the present invention is successfully applied to multiple projects of uplifting the underground pipelines, showing great economic and social benefits and a wide development and application prospect.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFEKEY ENGINEERING TECHNOLOGY (ZHENGZHOU) LTDNORTH OF JINGNAN 8TH NORTH 2ND ROAD WEST OF FOUR PORTS LINKAGE AVENUE ZHENGZHOU ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE ZHENGZHOU HENAN 450004

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Hongyuan Henan, CN 28 9
Shi, Mingsheng Henan, CN 11 26
Wang, Fuming Henan, CN 48 69
Wang, Xiaoliang Henan, CN 79 338
Zhong, Yanhui Henan, CN 16 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00