Method for producing a coffee beverage and coffee machine for performing the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9351601
APP PUB NO 20140242226A1
SERIAL NO

14343238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing a coffee beverage in a brewing chamber (36) of a coffee machine (10) and to a coffee machine (10) for performing a method for producing a coffee beverage. The aim of the invention is to improve the dispensing of coffee, especially in its first phase, in order to avoid undesired splashing due to increased pressure of the coffee beverage at the coffee beverage outlet (47), According to the method of the invention, the brewing water is supplied to the brewing water inlet (35-1) of the brewing chamber (36) at a first volume flow rate during a first period of time (T1) of a first brewing phase (a), and during a second period of time (T2) of the first brewing phase (a), the brewing water is supplied to the brewing water inlet (35-1) of the brewing chamber (36) at a second volume flow rate, wherein the first volume flow rate and the second volume flow rate are both different from zero and wherein the second volume flow rate is lower than the first volume flow rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JURA ELEKTROAPPARATE AG4626 NIEDERBUCHSITEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Büttiker, Philipp Oberbuchsiten, CH 10 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 30, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00