Power converter with separate buck and boost conversion circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9350243
SERIAL NO

14370591

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus (100) includes a buck and boost conversion circuit (110), and a control unit (120, 200) for controlling operations of the buck and boost converter. The buck and boost converter includes a buck conversion circuit having a first set of switches (SW3, SW4), and a boost conversion circuit having a second set of switches (SW5, SW6). The buck conversion circuit and the boost conversion circuit may be controlled independently from each other. The control unit is configured to control delivery of power from the power converter to a load (20) via the buck conversion circuit in a buck conversion mode by controlling switching operations of the first set of switches, and to control the delivery of the power from the power converter to the load via the boost conversion circuit in a boost conversion mode by controlling switching operations of the second set of switches.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIGNIFY HOLDING B VHIGH TECH CAMPUS 48 EINDHOVEN 5656 AE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Zhi Quan Shanghai, CN 15 101
Wang, Hong Bo Shanghai, CN 1 22
Xu, Jian Lin Shanghai, CN 2 42
Zhou, Zhen Hua Shanghai, CN 13 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00