Archery bow

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9341422
APP PUB NO 20150233667A1
SERIAL NO

14621862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An archery bow for selectively firing multiple projectiles one at a time and having riser with first and second ends and limb arrangements fixed relative thereto with a bow string is joined therebetween, the bow having a drum housing and a selectively rotatable drum rotatably secured relative to the housing, the drum being rotatable about a drum axis and having a projectile openings circumferentially spaced about the drum axis, each of the projectile openings shaped to receive a projectile wherein a plurality of projectiles can be secured in the drum at one time, one of the projectile openings being in a firing position and supporting a projectile to be fired by the bow, the remaining projectile openings being spaced from the firing position to reduce interference with the projectile to be fired, the drum having a rotation mechanism to rotate each of openings into the firing position individually, the bow further including a shooting force mechanism to selectively propel the projectiles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXT GENERATION LLC225 W BARTGES STREET AKRON OH 44307

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Box, Joe G Twinsburg, US 9 72
Rodich, Rudy D Aurora, US 9 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00