Heat source system and control method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9341401
APP PUB NO 20130125573A1
SERIAL NO

13812790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a heat source system that includes two heat source devices connected in series to a heat medium and can be efficiently operated. A heat source system (1) reduces the temperature of chilled water that is guided from a cooling load and has a predetermined return temperature Tr, to a predetermined supply temperature Ts, and supplies the chilled water to the cooling load. The heat source system (1) includes: a second centrifugal chiller (TR2) that reduces the temperature of the chilled water from the return temperature Tr to an intermediate temperature T2; a first centrifugal chiller (TR1) that reduces the temperature of the chilled water that has been reduced to the intermediate temperature T2 by the second centrifugal chiller (TR2), to the supply temperature Ts; and a control unit (9) that variably sets the intermediate temperature T2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES THERMAL SYSTEMS LTDSANTINGMU NO 2 FAN NO 3 TAKESHITA PILLS THE CAPITAL OF TOKYO JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nikaido, Satoshi Tokyo, JP 27 75
Sakai, Masanobu Tokyo, JP 20 75
Wajima, Kazuki Tokyo, JP 15 32
Yokoyama, Akimasa Tokyo, JP 5 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00