Process for producing cellulose derivatives of high bulk density, good flowability and/or dispersibility in cold water as well as low solution color

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9340624
APP PUB NO 20150239992A1
SERIAL NO

14422253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A particulate cellulose derivative is obtained in a process of grinding and drying a moist cellulose derivative which comprises the steps of A) providing a cellulose derivative having a moisture content of from 60 to 95 percent, based on the total weight of the moist cellulose derivative; B) grinding and partially drying the moist cellulose derivative in a gas-swept impact mill; C) contacting the ground and partially dried cellulose derivative with an additional amount of a drying gas outside the gas-swept impact mill; and D) subjecting the cellulose derivative to partial depolymerization after having contacted the cellulose derivative with a drying gas in step C). The obtained particulate cellulose derivative has a high untapped bulk density, a good flowability and a low color intensity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUTRITION & BIOSCIENCES USA 1 LLC200 POWDER MILL ROAD WILMINGTON DE 19803

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goerlach-Doht, Yvonne M Rosengarten, DE 14 34
Hermanns, Juergen Nottensdorf, DE 16 34
Hoelzer, Bettina Walsrode, DE 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00