Method and system for the production of hard plaster

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9340455
APP PUB NO 20110168061A1
SERIAL NO

13063719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the production of hard plaster, a calcining plant, and a retrofit reactor for calcining plants. The method includes feeding plaster material, predominantly including beta-hemihydrate plaster, to a postreactor. The temperature is set to at least a calcining temperature of 95° C. during this step. The plaster material is retreated in the postreactor to form hard plaster, the beta-hemihydrate plaster being converted directly into alpha-hemihydrate plaster at a temperature above 95° C. The hard plaster can then be discharged out of the postreactor and cooled. Conversion can be carried out in the postreactor during continuous operation, and conversion of the beta-hemihydrate plaster can occur with a dwell time in the postreactor of less than 30 minutes. Steam can be externally supplied to the postreactor and the temperature and pressure in the postreactor can be regulated so that the temperature is at least 95° C. and an over pressure prevails.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLAUDIUS PETERS PROJECTS GMBHSCHANZENSTRASSE 40 BUXTEHUDE 21614

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gehle, Tobias Hammah, DE 1 0
Goecke, Volker Ahlerstedt, DE 3 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00