Regeneration method of raw materials for hydrogen supply system of fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9340419
APP PUB NO 20150175415A1
SERIAL NO

14552084

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method and related system of regenerating a raw material for a hydrogen supply system of a fuel cell. The method includes reacting aluminum and a metal hydroxide to produce hydrogen in the hydrogen supply system of a fuel cell; and recovering an aluminum compound produced simultaneously with the hydrogen in the reaction. An aluminum hydroxide is obtained from the aluminum compound. The aluminum hydroxide is heat-treated to obtain an aluminum oxide. The aluminum oxide is reduced to obtain aluminum. The obtained aluminum is re-supplied as a raw material for producing the hydrogen.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
THE INDUSTRY & ACADEMIC COOPERATION IN CHUNGNAM NATIONAL UNIVERSITY (IAC)99 DAEHAK-RO YUSEONG-GU DAEJEON 34134 34134

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Seong Seock Daejeon, KR 1 0
Han, Moon Hee Daejeon, KR 3 26
Hwang, Inchul Seoul, KR 36 144
Kim, Chang Ho Yongin-si, KR 84 1298
Kim, Dae-Young Sejong-si, KR 284 9159
Kim, Hyung Ki Seoul, KR 34 200
Lee, Jong Hyeon Daejeon, KR 9 10
Ryu, Hong Youl Jecheon-si, KR 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 17, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00