Operation scheduler for a building automation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9338238
APP PUB NO 20120143378A1
SERIAL NO

13310484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A computer-implemented method for managing and controlling multiple automation components coupled via a building automation network. The computer implemented method includes receiving, via the building automation network, a first operational schedule from a first automation device where the first operational schedule is formatted according to a first protocol, receiving, via the building automation network, a second operational schedule from a second automation device where the second operational schedule is formatted according to a second protocol, converting the received second operational schedule from the second protocol to the first protocol, generating a unified schedule that includes the first operational schedule and the converted second operational schedule, and displaying the unified schedule in a user accessible manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS INDUSTRY INC100 TECHNOLOGY DRIVE ALPHARETTA GA 30005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baum, Michael J Village of Lakewood, US 17 2330
Koerner, Charles James Aurora, US 2 39
Marchi, Michael J Algoquin, US 3 102
Nickels, Patrick M Palatine, US 1 38
Spears, Lonnie Douglas Racine, US 3 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00