Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9337697
APP PUB NO 20140026551A1
SERIAL NO

14111339

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid construction machine that enables to efficiently cool a generator motor, while suppressing an increase in the entire length of a power unit. A motor housing is provided with a bulging portion which is configured to axially bulge from the inner periphery of a motor side connection surface toward an engine over the entire circumference thereof around an axis, and to engage with the inside of an engine housing; and a coolant passage which is configured to flow a coolant for cooling a stator therethrough. The inner peripheral surface of the motor housing including the inner peripheral surface of the bulging portion is configured to come into plane contact with the outer peripheral surface of the stator. The coolant passage is disposed at a position axially displaced from the motor side connection surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTD2-1 ITSUKAICHIKOU 2-CHOME SAEKI-KU HIROSHIMA HIROSHIMA-SHI 731-5161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hirozawa, Mitsunori Hiroshima, JP 15 81
Yamazaki, Yoichiro Hiroshima, JP 93 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00