System for producing graphene in a magnetic field

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9334168
APP PUB NO 20150315025A1
SERIAL NO

14799676

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An improved system for generating graphene involves producing a plurality of ionized carbon atoms in a plasma generation chamber and providing the plurality of ionized carbon atoms to a graphene generation chamber having a magnetic structure that includes a two-dimensional array of alternating polarity magnetic sources that produce a magnetic field having a gradient sufficient to float graphene over the magnetic structure. The graphene generation chamber generates graphene from said plurality of ionized carbon atoms over said magnetic structure such that said graphene floats over said magnetic structure due to said graphene being diamagnetic. The rate at which the plurality of ionized carbon atoms is produced is controlled to control the rate of graphene generation. The magnetic field of the magnetic structure can be controlled to control the rate at which the generated graphene moves through the graphene generation chamber until it exits as a recovered graphene product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CEDAR RIDGE RESEARCH LLC125 PETER LANE HUNTSVILLE AL 35760

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fullerton, Larry W New Hope, US 332 14265
Roberts, Mark D Huntsville, US 214 6157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00