Controller of the power inverter circuit and a control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9331574
APP PUB NO 20110181260A1
SERIAL NO

12935832

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A highly accurate control is achieved in such a way that a timing value is generated from a differential control amount calculation result and a filter calculation result at iteration intervals not exceeding the iteration intervals of the filter calculation and then the timing set value of a driving signal generation circuit is updated by this timing value. A device for controlling a power conversion circuit comprises an AD conversion circuit (22), a driving timing value generation circuit (23), and a driving signal generation circuit (24). The driving timing value generation circuit (23) includes a control amount calculation circuit (231) and a digital-digital addition circuit (232). The digital-digital addition circuit (232) generates a driving timing value for a switch of a power conversion circuit. The driving signal generation circuit (24) receives the driving timing value and generates a driving signal for the switch (11) of the power conversion circuit (1).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAGASAKI UNIVERSITY NATIONAL UNIVERSITY CORPORATION1-14 BUKYO-MACHI NAGASAKI-SHI NAGASAKI 852-8521

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurokawa, Fujio Nagasaki, JP 20 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00