Power factor converter with nonlinear conversion ratio

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9331562
APP PUB NO 20150236608A1
SERIAL NO

14280894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a power-factor converter with nonlinear conversion ratio, wherein the power-factor converter includes a first inductor, a second inductor, a rectifier circuit and a switch circuit. The switch circuit is arranged to be switched to form a circuit equivalent to a parallel connection of the first inductor and the second inductor during an inductor-charging-phase for charging the first inductor and the second inductor in parallel by an AC power source, and form a circuit equivalent to a series connection of the first inductor L1 and the second inductor L2 during an inductor-discharging-phase for discharging the first inductor and the second inductor to the rectifier circuit in series.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LITE-ON TECHNOLOGY CORPORATION22F NO 392 RUEY KUANG ROAD NEIHU DIST TAIPEI CITY
LITE-ON ELECTRONICS (GUANGZHOU) LIMITEDNO 25 GUANGPU W RD GUANGZHOU SCIENCE CITY GUANGZHOU HI-TECH INDUSTRIAL DEVELOPMENT ZONE GUANGZHOU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yi-Fu Bade, TW 90 330
Chiu, Huang-Jen New Taipei, TW 22 78
Huang, Jin Chyuan Hsinchu, TW 1 3
Liu, Yu-Chen Taipei, TW 107 517
Lo, Yu-Kang Taipei, TW 21 80
Wang, Chao-Fu Tainan, TW 7 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00