Method for producing a display element for an electro-wetting display and a display element for an electro-wetting display

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9323043
APP PUB NO 20140071515A1
SERIAL NO

13773745

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To produce a display element for an electrowetting display, there is provided a quantity of fluid which is greater than both the first volume of a display chamber and the second volume of a reservoir chamber, but less than the sum of the first volume and second volume. The fluid is divided into first and second partial drops, the first being introduced into the display chamber, the second being introduced into the reservoir chamber. The display and reservoir chambers are brought together so that a first opening in a first intermediate film of the display chamber and a second opening in a second intermediate film of the reservoir chamber at least partly overlap. An electrical field is applied to the display chamber and to the reservoir chamber, thereby uniting the first partial drop and the second partial drop.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADVANCED DISPLAY TECHNOLOGY AG9050 APPENZELL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bitman, Andriy Dortmund, DE 17 23
Jerosch, Dieter Bad Soden, DE 16 37
Mueller-Marc, Oliver Appenzell, CH 8 8
Rawert, Markus Coesfeld, DE 6 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00