Cell capturing filter having high aspect ratio

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9322755
APP PUB NO 20130149217A1
SERIAL NO

13713678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cell capturing filter, in which cells or particles having a predetermined size or greater in a sample may be easily captured, and clogging of a flow passage due to the captured cells or particles may be prevented, and stresses acting on the captured cells or particles may be reduced, having a first surface and a second substrate having a second surface that is bonded to the first surface, wherein the first substrate may include a flow passage formed in the first surface of the first substrate so that a sample flows in the flow passage, and a barrier that protrudes across the flow passage, and the second substrate may include a fine groove formed in an area on the second surface corresponding to the barrier, and a gap may exist between a surface of the barrier and the fine groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDGYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baek, Sang-hyun Hwaseong-si, KR 21 121
Jeong, Hyo-young Incheon, KR 16 37
Kim, Min-seoks Yongin-si, KR 2 13
Kim, Yeon-jeong Yongin-si, KR 17 50
Lee, Jeong-gun Seoul, KR 110 1162
Lee, June-young Anyang-si, KR 20 117
Oh, Jin-mi Suwon-si, KR 9 19
Sim, Tae-seok Seoul, KR 14 76
Song, Mi-jeong Suwon-si, KR 55 795

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00