Storage tank containment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9321588
APP PUB NO 20150021341A1
SERIAL NO

14506909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A large volume natural gas storage tank comprises a plurality of rigid tubular walls each having opposing ends and an intermediate segment with a closed tubular cross-section, the plurality of rigid tubular walls arranged in a closely spaced relationship and interconnected at their ends to form a six-sided storage tank, with each of the six sides of the storage tank defined by four successive of the plurality of rigid tubular walls connected end-to-end, such that the interiors of the plurality of rigid tubular walls define an interior fluid storage chamber; and an exterior support structure, the exterior support structure including one or more braces connected to the exteriors of at least some of the plurality of rigid tubular walls and adapted to reinforce the at least some of the plurality of rigid tubular walls against dynamic loading from fluid in the interior fluid storage chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALTAIR ENGINEERING INC1820 EAST BIG BEAVER ROAD TROY MI 48083

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lamb, Thomas Lynnwood, US 23 171
Parthasarathy, Mohan Macomb, US 65 3186
Ramoo, Regu Ashburn, US 14 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 26, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00