AC-to-DC power supply apparatus and power control structure and method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9318949
APP PUB NO 20130077370A1
SERIAL NO

13626892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An AC-to-DC power supply apparatus and a power control structure and method thereof are provided. The provided method includes: making an AC-to-DC converter in the AC-to-DC power supply apparatus convert an AC input voltage in response to a driving signal, so as to generate a DC output voltage; sampling a rectified voltage relating to the AC input voltage, so as to provide a sampling signal; providing an output feedback signal relating to an output of the AC-to-DC converter; multiplying the sampling signal by the output feedback signal, so as to provide a product signal; performing a signal modulation on the product signal, so as to generate the driving signal to control a switching of a main power switch in the AC-to-DC converter; and performing an amplitude-limiting process on the sampling signal or the product signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FSP TECHNOLOGY INCNO 22 JIANGUO E RD TAOYUAN CITY TAOYUAN COUNTY 330
FSP-POWERLAND TECHNOLOGY INC4TH FLOOR BUILDING 7 R&D REGION I XUZHUANG SOFTWARE INDUSTRIAL BASE # 699-8 XUANWU AVENUE XUANWU DISTRIAL NANJING 210042

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gu, Lin-Lin Nanjing, CN 1 6
Sun, Ju-Lu Nanjing, CN 7 70
Wang, Chuan-Yun Nanjing, CN 7 52
Xu, Ming Nanjing, CN 491 9425

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00