Switching contactor
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 19, 2016
Grant Date -
Jul 11, 2013
app pub date -
Jan 8, 2013
filing date -
Jan 9, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
A switching electrical power contactor having a bi-blade type switch, has ferrous plates attached to the blades to increase the current carrying capacity and reduce the resistance of the switch. The contactor is incorporated on the outside of a mains meter enclosure or in a wall box for a mains meter, within the space defined by the sprung jaws of the meter socket.
First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
JOHNSON ELECTRIC INTERNATIONAL (UK) LIMITED | TYNE AND WEAR NE35 9PF |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Connell, Richard Anthony | Shatin, HK | 26 | 174 |
# of filed Patents : 26 Total Citations : 174 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 19, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Legal Events

Matter Detail

Renewals Detail
