Method and device for determining a maximum leakage current

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9316678
APP PUB NO 20140312917A1
SERIAL NO

14262053

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method and a device for determining a maximum leakage current in unearthed power supply networks with a plurality of conductors. The method comprises the steps of: feeding of a measurement signal UP with a measurement frequency fpuls into a conductor arrangement, setting the measurement frequency fPuls, measuring a line-to-line voltage UL-E for each conductor, determining a maximum occurring line-to-line voltage UL-Emax from the measured line-to-line voltages UL-E, determining a voltage UZe across a measurement resistance RM for calculating a leakage impedance ZE, calculating the leakage impedance ZE, and calculating a maximum leakage current THC. The device comprises a signal generator for feeding in the UP with the fPuls, a network coupling circuit between the signal generator and the conductor arrangement, a voltage measuring circuit for measuring the UL-E, and an impedance measuring circuit for determining the Ze by means of the determining of the UZe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BENDER GMBH & CO KGLONDORFER STRASSE 65 GRUENBERG 35305

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schaefer, Oliver Gruenberg-Harbach, DE 67 332

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00