Method of producing a panel and a core therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9314977
APP PUB NO 20110278761A1
SERIAL NO

13130162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a panel includes:

    placing an assembly including core elements and impregnatable material webs extending along and between the core elements on a mold, which assembly includes a first side and a second side which is situated opposite the first side,enclosing the assembly under a cover layer in a sealing manner with respect to the mold,introducing at least one inlet for injection material, which inlet ends at a first side of the assembly,connecting the space which is enclosed by the cover layer and the mold to a discharge,injecting injection material via the inlet on the first side of the assembly and causing the injection material to move along via paths formed by the material webs between the core elements,discharging air and/or gas from the enclosed space via the discharge via underpressure at a position which is at a different level to the position where the inlet ends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FIBERCORE IP B V3089 JE ROTTERDAM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peeters, Johannes Hendricus Alphonsus Rotterdam, NL 11 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 19, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00