Automated demand response scheduling to reduce electrical loads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9310786
APP PUB NO 20120323393A1
SERIAL NO

13163143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for reducing an electrical load in a facility with a building automation system, includes first receiving information for a demand response event from an automated demand response server at an automated demand response client. After receipt of a new demand response event, the system determines a plurality of devices of the building automation system to be controlled during the demand response event. Next, the system prepares a schedule of control actions for the plurality of devices during the demand response event. The system then sends control messages to the building automation system to execute the control actions for the plurality of devices according to the schedule of control actions for the demand response event.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS INDUSTRY INC3333 OLD MILTON PARKWAY ALPHARETTA GA 30005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ersch, Florian Monmouth Junction, US 16 97
Hiller, Paula Island Lake, US 2 64
Imhof, Raphael Palatine, US 10 448
Marchi, Michael J Algonquin, US 3 102
Rule, Thomas Arlington Heights, US 10 538
Songkakul, Pornsak Mequon, US 29 1285

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00