Method for determining at least one physical, chemical and/or biological measured variable by means of optical sensors, and turbidity sensor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9310297
APP PUB NO 20150103344A1
SERIAL NO

14509337

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A turbidity sensor and a method for determining at least one physical, chemical and/or biological measured variable of process automation in a medium by means of at least one optical sensor, comprising the steps of sending transmission signals into the medium, wherein the transmission signals are converted into received signals by interaction with, especially by scattering from, the medium as a function of the measured variable; receiving the received signals; and converting the received signals into the measured variable as a function of environmental conditions at the location of installation and, adjusting the sensor based on a calibration graph corresponding to environmental conditions at the location of installation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENDRESS + HAUSER CONDUCTA GESELLSCHAFT FUR MESS- UND REGELTECHNIK MBH + CO KGDIESELSTR 24 GERLINGEN 70839

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gotz, Carsten Ettenheim, DE 5 5
Grossmann, Matthias Vaihingen-Enz, DE 16 20
Kratschmer, Thilo Gerlingen, DE 6 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00