Process and method for improving the enzymatic hydrolysis of lignocellulosic biomass by addition of hydrothermally treated stillage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9309548
APP PUB NO 20140273108A1
SERIAL NO

14215425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing hydrolysate from cellulosic material by adding hydrothermally treated stillage or a fraction thereof to cellulosic material, treating the mixture of hydrothermally treated stillage and cellulosic material with at least one hydrolyzing enzyme, and hydrolyzing and converting complex carbohydrates in the cellulosic material. The hydrolysate produced by the method. Ethanol, organic acids, and organism metabolites produced by the method. Biomass produced by the method. A method of increasing sugar production rate and yield of sugars from cellulosic material by adding hydrothermally treated stillage or a fraction thereof to cellulosic material, treating the mixture of hydrothermally treated stillage and cellulosic material with at least one hydrolyzing enzyme, and hydrolyzing complex carbohydrates in the cellulosic material and forming sugars.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRUCENT INC7400 NEWMAN BOULEVARD DEXTER MI 48130

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bleyer, James Robert Maumee, US 10 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 12, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00