Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9304969
APP PUB NO 20130151087A1
SERIAL NO

13687410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present charging rate of a battery is accurately calculated. The calculation mode of the present charging rate is switched to a current integration mode during operation of a generator motor while the mode is switched to a voltage reference mode at a predetermined switchover timing. In the current integration mode, charge current of the battery is integrated and added to the initial charging rate and an integrated discharge current value is subtracted from the initial charging rate of the battery to calculate the present charging rate. In the voltage reference mode, the present charging rate is calculated based on a predetermined map and detected voltage of the battery. After calculation of the present charging rate according to the voltage reference mode, the calculation mode is restored from the voltage reference mode to the current integration mode and the suspension of operating the generator motor is cancelled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO CONSTRUCTION MACHINERY CO LTD2-1 ITSUKAICHIKOU 2-CHOME SAEKI-KU HIROSHIMA HIROSHIMA-SHI 731-5161

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Takayuki Hiroshima, JP 65 632
Goto, Naoki Hiroshima, JP 87 937
Komiyama, Masayuki Hiroshima, JP 29 630

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00