Sychronous control integrated system for bridge lifting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9303372
APP PUB NO 20140309767A1
SERIAL NO

14247668

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A synchronous control integrated system for bridge lifting, comprising a monitor mechanism; an oil pressure control mechanism, connected to the monitor mechanism; a plurality of jacks, each connected to the oil pressure mechanism, respectively; and a sensor mechanism, connected to the monitor mechanism. As such, a shift variance generated by girders of a bridge may form a signal by using a sensor mechanism and jacks together transmitted on line to a monitor mechanism as a control parameter, so that the monitor mechanism may have an accurate adjustment and monitoring on an oil pressure control mechanism and the jacks, whereby completing the synchronous control operation for the bridge lifting course. Furthermore, the bridge lifting construction may have its improved accuracy and safety.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA ENGINEERING CONSULTANTS INC28F NO 185 SEC 2 XINHAI RD DA?AN DIST TAIPEI CITY 106
CHENG SHIU UNIVERSITYNO 840 CHENGCING RD NIAOSONG TOWNSHIP KAOHSIUNG COUNTY R O C

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chao, Min Kaohsiung, TW 8 19
Liao, Ching-Lung Taipei, TW 6 57
Ma, Jin-Chung NewTaipei, TW 4 2
Peng, Wu-Peng Taipei, TW 3 0
Wang, Chung-Yue NewTaipei, TW 14 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00