Zinc oxide-based conductive multilayer structure, process for producing the same, and electronic device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9303308
APP PUB NO 20130052458A1
SERIAL NO

13696653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A zinc-oxide-based conductive stacked structure 1 includes a substrate 11 and, formed on at least one surface of the substrate, an undercoat layer 12 and a transparent conductive film 13. The transparent conductive film is formed of a plurality of transparent conductive layers formed from a zinc-oxide-based conductive material and has a carrier density of 2.0×1020 to 9.8×1020 cm−3. The zinc-oxide-based conductive stacked structure exhibits a change ratio in sheet resistivity of 50 or less, after bending of the stacked structure around a round bar having a diameter of 15 mm, with the transparent conductive film facing inward.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LINTEC CORPORATION23-23 HONCHO ITABASHI-KU TOKYO 1730001 ?1730001
KOCHI UNIVERSITY OF TECHNOLOGY185 MIYANOKUCHI TOSAYAMADA-CHO KAMI-SHI KOCHI 782-8502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amino, Yumiko Tokyo, JP 29 72
Kondo, Takeshi Tokyo, JP 188 991
Nagamoto, Koichi Tokyo, JP 28 331
Naganawa, Satoshi Tokyo, JP 47 184
Yamada, Takahiro Kochi, JP 289 3040
Yamamoto, Tetsuya Kochi, JP 636 13176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00