Rapid prototyping apparatus for producing three-dimensional ceramic object

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9302431
APP PUB NO 20150231832A1
SERIAL NO

14608592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rapid prototyping apparatus includes a construction platform, a movable platform, a printing module, a cleaning and maintenance module, a construction material spreading element, a heater and a heat shield. A construction chamber is formed in the construction platform. The movable platform and the construction platform are movable relative to each other. The printing module is installed on the movable platform, and includes at least one printhead unit. The cleaning and maintenance module is installed on the movable platform. The construction material spreading element is installed on the movable platform for spreading a ceramic construction material to the construction chamber. After the ceramic construction material is spread in the construction chamber, the construction material is heated by the heater. After the printhead unit performs a printing operation, the printhead unit is cleaned and maintained by the cleaning and maintenance module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROJET TECHNOLOGY CO LTDNO 28 R&D 2ND RD SCIENCE-BASED INDUSTRIAL PARK HSINCHU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Ke-Ming Hsinchu, TW 9 99
Shi, Kwo-Yuan Hsinchu, TW 19 204

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00