Extrusion press and control method for extrusion press

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9302304
APP PUB NO 20140216122A1
SERIAL NO

14342107

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An extrusion press includes a means which can prevent phenomena in which a billet is blown out during an extrusion process as well as prevent billet blowout with a simple and inexpensive constitution. The extrusion press drives a main cylinder device to extrude, by a stem , a billet filled into a container from a die and form a product. A gap measurement means that measures a gap arising at the container seal surface formed by pressing the die side end surface of the container against the container side end surface of the die is provided on an end platen on the outer edge part of the container side end surface of the die. When the gap arising during the extrusion process is measured and the measured value is within a predetermined range of allowable values, a set value for the extrusion rate is lowered and a warning is issued. When the measured value exceeds the predetermined allowable values, the extrusion process is stopped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UBE MACHINERY CORPORATION LTD1980 AZA OKINOYAMA OAZA KOGUSHI UBE 755-8633

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakano, Koji Ube, JP 113 1061
Yakushigawa, Atsushi Ube, JP 4 12
Yamamoto, Takeharu Ube, JP 88 431

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 5, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00