Gas turbine power plant with flue gas recirculation and oxygen-depleted cooling gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9297311
APP PUB NO 20120240590A1
SERIAL NO

13426043

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is disclosed for operating a gas turbine power plant having a gas turbine, a heat recovery steam generator and an flue gas splitter which splits flue gases into a first flue gas flow for recirculation into an inlet flow of the gas turbine and into a second flue gas flow for discharge to an environment. An oxygen-depleted gas can be used in an open cooling system for cooling hot gas parts of the gas turbine. A split compressor intake can be provided for separate feed of recirculated flue gas and fresh air into a compressor intake. Compressor blades can include a separating band which blocks intermixing of recirculated flue gas and fresh air during compression.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANSALDO ENERGIA IP UK LIMITED5TH FLOOR NORTH SIDE 7/10 CHANDOS STREET CAVENDISH SQUARE LONDON W1G9DQ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benz, Eribert Birmenstorf, CH 27 168
Burdet, Andre Villars sur Glane, CH 6 75
Guethe, Felix Basel, CH 15 116
Hellat, Jaan Baden-Ruetihof, CH 36 543
Hoevel, Michael Lengnau AG, CH 3 12
Rofka, Stefan Nussbaumen, CH 20 227
Sander, Frank Rieden AG, CH 14 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00