Treatment of a waste stream through production and utilization of oxyhydrogen gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9296629
APP PUB NO 20130105376A1
SERIAL NO

13725074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for reducing a redox active contaminant in a waste stream in a waste treatment system involve performing a unit process of the waste treatment system by contacting redox active contaminant in the waste stream with oxyhydrogen-rich gas generated on-site by an oxyhydrogen gas generator that implements water dissociation technology. The oxyhydrogen gas generator involves applying a pulsed electrical signal to a series of closely spaced electrodes that are submerged in the waste stream to produce oxyhydrogen-rich gas from a water component of the waste stream. Operation of the oxyhydrogen gas generator in the waste stream may accomplish one or more unit processes for waste treatment, such as oxidation, stripping, floatation, disinfection, conditioning, stabilization, thickening, and dewatering, among others.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XOGEN TECHNOLOGIES INCSUITE 362 440 - 10816 MACLEOD TRAIL S CALGARY ALBERTA T2J 5N8

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alvarez-Vazquez, Hector Caledon, CA 2 13
Campbell, Herbert Wallace Dundas, CA 3 63
Chambers, Stephen Barrie Verkie, GB 6 119
Van, Vliet David Ritchie Calgary, CA 3 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00