Control valve assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 9291174
SERIAL NO

13486744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power machine and a power conversion system for a power machine are disclosed. In an exemplary embodiment, the power conversion system includes a pump configured to provide a source of pressurized hydraulic fluid and a control valve assembly to receive the hydraulic fluid. The control valve assembly includes a first valve element configured to direct hydraulic fluid to an actuator when the first valve element is in first and second actuated positions. The control valve assembly also includes a second valve element downstream of the first spool. The first valve element is moveable between an unactuated position and the first and second actuated positions and is configured to direct hydraulic fluid received from the actuator through the second actuated position to the second valve element and to direct hydraulic fluid received from the actuator through the first actuated position to bypass the second valve element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CLARK EQUIPMENT COMPANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coombs, Jason R Lisbon, US 4 18
Koch, Rodney Mooreton, US 9 164
Lacher, Jonathan J Fargo, US 1 7
St, Aubin Joseph A Wahpeton, US 8 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00