Combined cycle integrated combustor and nozzle system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9291124
APP PUB NO 20150007550A1
SERIAL NO

14199769

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine that operates and produces the entire required vehicle thrust below Mach 4 is useful for a Hypersonic combined cycle vehicle by saving vehicle and engine development costs. One such engine is a combined cycle engine having both a booster and a dual mode ramjet (DMRJ). The booster and the DMRJ are integrated to provide effective thrust from Mach 0 to in excess of Mach 4. As the booster accelerates the vehicle from Mach 0 to in excess of Mach 4, from Mach 0 to about Mach 2 incoming air delivered to the DMRJ is accelerated by primary ejector thrusters that may receive oxidizer from either on-board oxidizer tanks or from turbine compressor discharge air. As the TBCC further accelerates the vehicle from about Mach 0 to in excess of Mach 4 exhaust from the turbine and exhaust from the DMRJ are combined in a common nozzle disposed downstream of a combustor portion of the DMRJ functioning as an aerodynamic choke.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AEROJET ROCKETDYNE INCP O BOX 13222 SACRAMENTO CA 95813-6000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bulman, Melvin J Fair Oaks, US 34 300

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00