Metal layer-free multi-layer film with low surface weight

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9289966
APP PUB NO 20140306056A1
SERIAL NO

14363326

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal layer-free multi-layer film with a surface weight of ≦33 g/m2, shrinkage behavior of ≦10% at 90° C. as described herein and a layer structure: a layer (a) composed of at least one thermoplastic olefin homopolymer or copolymer as an outer layer, an adhesive layer (b) inseparable under a cohesion peeling effect, a layer (c) of at least one homopolyamide and/or copolyamide, at least one internal gas barrier layer (d) adjoining layer (c) and differing from layers (c) and (e) in the composition of the polymer component(s), a layer (e) adjoining the gas barrier layer (d) and composed of at least one homopolyamide and/or copolyamide, and a layer (i) of at least one homopolyamide and/or copolyamide as an outer layer. Also disclosed is a method of using such a multi-layer film for the production of a buoyancy/lift body and a buoyancy/lift body made of such a multi-layer film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARIA SOELL HIGH TECHNOLOGY FILMS GMBHFRANKENSTRASSE 45 63667 NIDDA-EICHELSDORF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blum, Thomas Verden, DE 19 213
Borm, Achim Bad Nauheim, DE 1 6
Fischer, Christian Erich Bruckberg, DE 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 22, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00