Connector, method of manufacturing connector, and flat cable with connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9287641
APP PUB NO 20140378001A1
SERIAL NO

14301993

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a connector including: a housing having a first fitting portion and a second fitting portion to which a flat cable and mating connector are fitted, respectively; and a contact held in the housing and having a first contacting portion a second contacting portion making contact with the flat cable and mating connector, respectively, the contact has first and second arm portions, one end of the first arm portion connects to one end of the second arm portion with a U-shaped portion, a non-connection sides of the first and arm portions interpose the flat cable, the first contacting portion is provided at or in the vicinity of a tip of the first arm portion, and the second contacting portion is formed on at least one of the first and second arm portions and is positioned between the U-shaped portion and the tips of the first and second arm portions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACES ELECTRONICS CO LTDNO 13 DONGYUAN ROAD JHONGLI DISTRICT TAOYUAN CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Nobukazu Fussa, JP 62 954
Yoshida, Norio Atsugi, JP 91 2302

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00