Separator, manufacturing method of the same, and electrochemical device having the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9287545
APP PUB NO 20130244082A1
SERIAL NO

13851643

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The separator of the present invention comprises a porous composite having a porous substrate and a first porous coating layer formed on at least one surface of the porous substrate and comprising a mixture of inorganic particles and a first binder polymer; and a second porous coating layer formed on a first surface of the porous composite and comprising a mixture of cathode active material particles, a second binder polymer and a first conductive material, a third porous coating layer formed on a second surface of the porous composite and comprising a mixture of anode active material particles, a third binder polymer and a second conductive material, or both of the second porous coating layer and the third porous coating layer. Also, the separator of present invention may further comprise a fourth porous coating layer formed on at least one outermost surface thereof and comprising a fourth binder polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jin-Woo Daejeon, KR 147 1395
Kim, Jong-Hun Daejeon, KR 137 2183
Lee, Joo-Sung Daejeon, KR 102 522

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 15, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00