Connector in which grounding boards are combined with assembly tongue plate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9281642
SERIAL NO

14624952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is to provide a connector which is compatible to USB Type-C standard and includes an assembly tongue plate, two grounding boards and a metal casing. The assembly tongue plate includes a first terminal block made of plastic and having a plurality of first connection terminals disposed therein, a second terminal block made of plastic and having a plurality of second connection terminals disposed therein, and a metal separating plate being assembled between a bottom surface of the first terminal block and a top surface of the second terminal block. The two grounding boards can be fastened with each other to enclose outer edges of the first terminal block and second terminal block when the metal separating plate is assembled between the first terminal block and second terminal block, so as for allowing the assembly tongue plate to be easily and quickly assembled into the metal casing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIMULA TECHNOLOGY INC14F NO 1351 ZHONGZHENG RD TAOYUAN DIST TAOYUAN CITY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tseng, Te-Chih Taoyuan, TW 7 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00