Method for operating a wind turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9279411
SERIAL NO

13243277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a method of operating a wind power installation. The wind power installation has a circuit for measuring the frequency prevailing in the electrical supply network connected to a control device for controlling operation of the wind power installation. It is proposed that the power delivered by the generator of the wind power installation to the network is increased quickly and for a short period above the currently prevailing power of the wind power installation if the network frequency of the electrical network is below the desired target frequency of the network by a predetermined frequency value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WOBBEN PROPERTIES GMBHAURICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beekmann, Alfred Wiesmoor, DE 36 293
De, Boer Wolfgang Moormerland, DE 18 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00