Cellulase enzymes having a modified linker and reduced lignin binding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9279112
APP PUB NO 20100221778A1
SERIAL NO

12713516

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are modified cellulase enzymes exhibiting increase cellulose-hydrolyzing activity in the presence of lignin and/or reduced binding to lignin comprising modified linker peptides comprising one or more amino acid substitutions, insertions, or deletions that result in (a) a decrease in the calculated isoelectric point of the linker peptide and/or (b) an increase in the ratio of threonine:serine in the linker peptide relative to a parental linker peptide from which said modified linker peptide is derived. Also provided are genetic constructs comprising nucleic acid sequences encoding for modified cellulase enzymes, methods for the production of the modified cellulase enzymes from host strains and a process for hydrolyzing cellulose with the modified cellulases in the presence of lignin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOGEN ENERGY CORPORATION310 HUNT CLUB ROAD EAST OTTAWA ONTARIO K1V 1C1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lavigne, James Ontario, CA 17 42
Masri, Nabil Quebec, CA 7 59
Scott, Brian R Ontario, CA 23 172
St-Pierre, Patrick Quebec, CA 7 61
Tomashek, John J Ontario, CA 14 75
White, Theresa C Ontario, CA 10 106

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 8, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00