Generating high-frequency power for a load

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9276456
APP PUB NO 20150288274A1
SERIAL NO

14742898

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power-supply system has a power converter configured to generate a high-frequency power signal and supply the high-frequency power signal to a load such as a plasma or gas laser process. The power converter includes a digital-to-analog converter (DAC) configured to generate an analog signal from a digital signal, an amplifier path in which the generated analog signal is amplified, and a logic-circuit unit coupled upstream of the DAC and configured to generate the digital signal and supply the generated digital signal to the DAC. The logic-circuit unit includes a signal-data buffer storing a signal-data value for generating a shape of the analog signal, an amplitude-data buffer storing an amplitude-data value for influencing an amplitude of the analog signal, and a multiplier configured to multiply the signal-data value by the amplitude-data value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRUMPF HUETTINGER GMBH + CO KGBOETZINGER STRASSE 80 FREIBURG 79111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grede, Andre Freiburg, DE 17 190
Krausse, Daniel Eichstetten, DE 8 146
Labanc, Anton Ehrenkirchen, DE 27 206
Thome, Christan Freiburg, DE 3 37
Vidal, Alberto Pena Freiburg, DE 5 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 1, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00